How to Reserve Timeslots for Performance Testing
This section describes how to reserve timeslots.
To learn more about topologies, see Performance Testing Timeslots Overview.
-
Prerequisites
- Ensure that there is a host pool defined and allocated to the project. For information about managing host pools in Lab Management, see the HPE ALM Lab Management Guide: How to Manage Lab Resources.
- If you want to run a particular test during the timeslot, ensure that an instance of that test is included in a test set.
- Make sure that at least one of the hosts in the host pool can be designated as a Controller, and that Host, Vuser, and Concurrent Run limits are defined in the project settings.
-
-
Verify availability of requested resources
Do one of the following:
-
(Recommended) Click Calculate Availability. The system checks the availability of the requested resources. The results of this calculation are displayed in the Timeslot Status tab and graphically on the resource availability timeline.
If the timeslot cannot be reserved, consider the reasons displayed in the Timeslot Status tab when reselecting your resources. If the timeslot can be reserved, you can click Submit to save the timeslot.
-
Click Submit. The system calculates the availability of the requested resources during the selected timeslot. If all of the resources are available, the Add New Timeslot dialog box closes and the timeslot is reserved and displayed in the Timeslots page. If the timeslot cannot be reserved, the reasons are displayed in the Timeslot Status tab.